WORKED CASE · SYNTHETIC TEST DATA

Estimate time left at a constant processing rate

For a small batch, compare the remaining work with the measured rate before relying on an ETA.

Input and settings

Total = 100
Processed = 25
Rate = 5 per second

Run and interpret

Use the defaults. There are 75 units left; dividing by 5 units per second gives 15 seconds.

Expected output

25.0%
75
0m 15s

Scope and possible misuse

Requires positive total and speed, and processed work between zero and total. Invalid ranges show an error. Estimates assume a constant rate and cannot predict stalls or changing workloads.

Unexpected result? Report a minimal example