WORKED CASE · SYNTHETIC TEST DATA
Estimate time left at a constant processing rate
For a small batch, compare the remaining work with the measured rate before relying on an ETA.
Input and settings
Total = 100
Processed = 25
Rate = 5 per secondRun and interpret
Use the defaults. There are 75 units left; dividing by 5 units per second gives 15 seconds.
Expected output
25.0%
75
0m 15sScope and possible misuse
Requires positive total and speed, and processed work between zero and total. Invalid ranges show an error. Estimates assume a constant rate and cannot predict stalls or changing workloads.